Did the HWP alert the crew that a kick was in progress? |
|
|
|
Did the HWP kill the rig engine prior to leave the operator’s station? | |
|
|
Did the HWP post the “BOP Open/Closed” sign? | |
|
|
Did the HWP direct the crewmembers to kill any remaining engines using the emergency kill switches prior to the crew members assembling at the briefing area? | |
|
|
Did the HWP position the work string so that the connections were clear of the BOP stack sealing elements and so that the connections were accessible from the work floor? | |
|
|
Did the HWP direct the crew worker(s) to ensure that the FOSV/TIW valve was in the “open” position? | |
|
|
Did the HWP direct the crew worker(s) to install and close the FOSV/TIW valve? | |
|
|
Did the HWP or assigned crew worker close the applicable preventer? | |
|
|
Did the HWP confirm that the well was shut-in? | |
|
|
Did all crewmembers assemble at the briefing area? | |
|
|
Did the HWP notify the supervisor. | |
|
|
Did the HWP obtain the "Shut-in casing pressure", "Shut-in Tubing Pressure", and "Time of Day" and record it on the rig field report (work ticket)? | |
|
|